Application file · Municipal

Municipal sewage & sludge

Water linePACclarify · remove phosphorus
Sludge lineCationic PAMthicken · dewater

Two products, each on its own line of the plant. Grades and dose are set on a jar test with your own water and sludge — not taken from a catalogue.

Municipal sewage and sludge treatment plant
Dosed at
Clarifiers · filter · thickener · press
Equipment
Belt press, screw press, centrifuge
Targets
Turbidity, phosphorus, cake dryness
Set by
Jar test on your own sample
The challenge

Four problems, four places in the plant

Follow the water from inlet to outlet. Each problem shows up at a different stage, which is why municipal plants often use two products.

Raw sewage inEffluent & sludge out
01020304
At the inlet

A load that keeps changing

Inflow and sludge change with season, rain and industrial discharges. A grade that worked last year may not today.

Primary clarifier

Fine solids that won’t settle

Colloids and fine particles carry a negative charge and repel each other, so they slip through the clarifiers.

Secondary · filter

Phosphorus limits

Biological treatment alone often cannot meet a tight phosphorus limit. Chemical precipitation closes the gap.

Sludge press

Sludge that won’t dewater

A wet cake means more trucks and higher disposal cost; a cloudy filtrate sends solids back to the head of the plant.

Treatment program

A typical program, stage by stage

Most plants use PAC on the water line and cationic PAM on the sludge line. Which stages you need depends on your plant and your discharge limits.

01

Primary clarification

PAC · optional

ProblemFine solids pass the primary clarifier

What it doesCoagulates fine solids so more settle out early

Where to doseFlash mixer or inflow channel before the primary clarifier

02

Phosphorus removal

PAC

ProblemEffluent phosphorus above the limit

What it doesAluminium binds phosphate into a solid that settles or is filtered out

Where to doseBefore the secondary clarifier or the tertiary filter

03

Tertiary filtration

PAC

ProblemTurbidity and solids in the final effluent

What it doesForms micro-flocs that the filter can catch

Where to doseAhead of the filter, with fast mixing

04

Sludge thickening

Cationic PAM · optional

ProblemThin sludge, large volumes to handle

What it doesFlocculates sludge so mechanical thickeners concentrate it

Where to doseFeed line to the thickener

05

Sludge dewatering

Cationic PAM

ProblemWet cake, cloudy filtrate

What it doesBridges sludge particles into strong flocs that release water on the press

Where to doseSludge feed pipe, shortly before the press or centrifuge

Dosing points

Where each product goes in

Send us your flow sheet and we mark the dosing points for your plant.

Water lineSludge lineDosing pointOptionalHover or tap points 1–5
WATER LINESLUDGE LINERawsewageScreens& gritPrimaryclarifierBiologicaltreatmentSecondaryclarifierTertiaryfilterCleaneffluentThickenerDewateringpress · centrifugeSludge cake12345
1PACOptional
Before the primary clarifier

Coagulates fine solids so more settle out early.

2PAC
Before the secondary clarifier

Binds phosphate into a solid that settles with the sludge.

3PAC
Ahead of the tertiary filter

Forms micro-flocs the filter can catch, for low turbidity and phosphorus.

4Cationic PAMOptional
Thickener feed

Flocculates thin sludge so the thickener concentrates it.

5Cationic PAM
Press or centrifuge feed

Builds strong flocs that release water for a drier cake.

Free jar test

Tested on your water and your sludge

Municipal sludge varies from plant to plant, so we test on your own sample before recommending a grade.

01 Send water and sludge

1 litre of water from the point you want to treat, and 1 litre of the sludge that goes to your press.

02 We test side by side

Several PAC grades on the water and several cationic PAM grades on the sludge, compared in parallel.

03 Written report

Recommended grades, the PAC : PAM ratio where both are used, and a starting dose.

04 Trial on your equipment

1 kg samples of the recommended grades for a trial on your own clarifier or press.

FAQ

Questions municipal plants ask.

Short answers on grades, phosphorus and dewatering. Anything else, ask us directly.

Talk to us sales@claripoly.com WhatsApp +86 134 1983 6447
ZZhanteng · Export & Technical Sales
Replies within one working day
What we provide Ask a question →
Which PAM do I need for a belt press, screw press or centrifuge?

Cationic PAM for all three, because municipal sludge is mostly organic. The best charge density and molecular weight differ with the sludge and the machine, so we test several grades on your own sludge and recommend one in writing.

Can PAC help us meet a phosphorus limit?

Yes. The aluminium in PAC binds phosphate into a solid that is removed in the clarifier or filter. The dose depends on how much phosphorus you need to remove; a jar test on your effluent gives the starting point.

Do we need both PAC and PAM?

Not always. Many plants use PAC on the water line and cationic PAM on the sludge line, but some only need one of them. The jar test shows which stages benefit and in what ratio.

Can you supply PAC and PAM in one shipment?

Yes. PAC and PAM ship in one container, in 25 kg bags or 1 t big bags, with a COA for every batch.

Do we need drinking-water PAC for a sewage plant?

No. Industrial PAC made to GB/T 22627-2022 is the usual choice for wastewater and sludge. Drinking-water PAC to GB 15892-2020 is only needed where potable-water standards apply.

What should we send for the jar test?

1 litre of water from the point you want to treat and 1 litre of sludge from the press feed, with a note on your dewatering equipment, the product and dose you use now, and your discharge limits.

Are samples free?

We send 1 kg samples of the recommended grades for a trial on your own equipment. Samples are free of charge; the buyer pays the courier.

What documents come with each shipment?

A certificate of analysis (COA) for every batch, plus the TDS and SDS. A certificate of origin comes with every shipment, and Form E for ASEAN destinations.

What is the minimum order and what payment terms do you accept?

Minimum order is 1 tonne per grade. We accept T/T (30% deposit, balance before shipment) and L/C at sight. Trial orders start at 1 tonne, so you start small and scale up once the grade is proven.

Tell us about your plant.

Tell us what you treat and what you use now. We reply within one working day and tell you where to send the sample.

Z
Your contactZhantengExport & Technical Sales

To get a quote in one reply, include

  • Application or industry
  • Product and dose you use now
  • Monthly volume and destination port

    Jar test or quotation · municipal

    What do you need?

    Your water, as far as you know:

    We reply within one working day.